East Live Oak Water Pump Additions

The City of Schertz is constructing a redundant pump system at the East Live Oak tank site in order to prolong the life of the existing pumps and to provide back-up pumps when maintenance is required. This project will reduce the possibility of interrupted water service to citizens caused by pump and motor failures. The project was designed by Ford Engineering and is being constructed by R.P. Constructors, Inc.

Construction Start: April 2020
Construction Completion: Winter 2020
Cost of Construction: $1,560,000.00
Funding Source: Water and Sewer Reserves

UPDATE -  june 2020

  • The taps on the existing waterlines are complete. 
  • Structure fill has been placed under the electrical and generator slabs. 
  • Steel pipe fabrication is ongoing.
  1. Scott McClelland, P.E.

    Engineer
    Phone: 210-619-1822

ELO Pump Upgrades_Site Map