East Live Oak Water Pump Additions

The City of Schertz is finalizing the design of a redundant pump system at the East Live Oak tank site in order to prolong the life of the existing pumps and to provide back-up pumps when maintenance is required. This project will reduce the possibility of interrupted water service to citizens caused by pump and motor failures. The project is being designed by Ford Engineering and is expected to be advertised for construction bids in early summer of 2019.

  1. Scott McClelland, E.I.T.

    Project Manager
    Phone: 210-619-1822

ELO Pump Upgrades_Site Map

ELO Pump Upgrades